A Condo Story: The Board Member Who Wanted to Fix Everything
Back to Blog
condo boardinfrastructuredecision makingspecial assessmentgovernanceowner tipsboard tips

A Condo Story: The Board Member Who Wanted to Fix Everything

MVP Condos Team

A condominium community had reached a point where many of its common elements were showing their age.

The roads were tired. The landscaping was dated. Owners wanted the property to feel new again.

One of the directors on the board decided to take initiative. Rather than simply identifying problems, they spent time researching solutions. They spoke with banks, contractors, looked at funding options, reviewed reserve fund projections, and put together what seemed like a practical plan.

Their proposal was straightforward: "Why don't we borrow the money, complete all the major improvements now, and spread the cost over time?"

The idea was well received. Many owners supported it. Several directors liked it too. After all, nobody enjoys watching reserve fund contributions increase year after year, and the prospect of improving the community sooner rather than later was appealing.

The board agreed to investigate.

What happened next surprised everyone.

The project that grew

The first project on the list was paving. That seemed simple enough — until the engineers found that some aging underground infrastructure was causing problems and would need to be addressed first.

Further investigation revealed that portions of that infrastructure were not included in the reserve fund study.

Now engineers needed to assess the site. Surveyors became involved. More information was needed before anyone could responsibly determine what work was required, what it would cost, or how much money should be borrowed.

Then another complication surfaced. Part of the underground infrastructure appeared to serve a neighbouring condominium as well. No one could immediately determine ownership responsibilities. The drawings were old. Records were incomplete. The answers weren't obvious.

What initially appeared to be a paving project had suddenly become an engineering, legal, surveying, and infrastructure project.

Lawyers became involved.

A month went by. Not because anyone was dragging their feet — but because everyone involved was engaged in the process, meeting, talking and looking for the right advice from the corporation's paid advisors, trying to make sure the corporation followed the right steps and made the right decision.

When patience runs out

Meanwhile, some owners became frustrated. From their perspective, a solution had already been identified. Why wasn't it moving faster?

The answer was that condominium corporations have a duty to understand the problem before committing owners' money to a solution.

Then, before the planning was complete, part of the aging infrastructure failed. What had been a future project suddenly became an urgent repair. Emergency work was required. Unexpected costs followed. A special assessment.

The project became more expensive than anyone had hoped. The schedule became longer than anyone expected.

Nobody was wrong

The board member who originally brought forward the idea wasn't wrong. The owners who agreed with them and wanted action weren't wrong. The professionals advising caution weren't wrong.

Everyone was looking at the same problem from a different perspective.

By the time the work was completed, many owners had forgotten how simple the project had seemed at the beginning.

The board, however, had learned an important lesson.

In condominium communities, the visible project is often only a small part of the real work. Behind every major decision are engineers, reserve fund planners, contractors, insurers, lenders, lawyers, and regulators — and dozens of considerations that most owners never see.

That doesn't mean owners shouldn't ask questions and wonder about what's going on. They should. It doesn't mean boards are always right. They aren't.

But it does explain why decisions that appear simple from the audience often become much more complex once all the facts are on the table.

How it ended

Is the paving project finished? Yes — but after a fall and winter of mud and a successfully appealed work stoppage order initiated by the neighbouring condo's legal team that held up work in the fall.

The owners never approved the borrowing bylaw, so condo fees and a special assessment covered the work. Many owners wanted the loan — but many is not always the required majority for these things. The owners speak with their vote in these instances.

The behind-the-scenes legal and collections matter with their neighbour is still ongoing. But the owners don't have to worry. Their budget is already set, their road is new, and they can sleep well knowing their board and management are looking out for them, using all the tools in their toolbelts, and making informed, responsible decisions.

The moral

Get involved in community governance. Don't be quick to blame your board.

Speak to your condo manager or board members at your AGM and learn about your community and what is going on. Take the CAO Director training — even if you aren't planning on running for the board. You'll find that your board has to consider all the facts carefully any time they make a decision, and you'll have a better understanding of how your condo works and your role in it.

And know that owners will likely not have access to all the facts, all the time.

Good condominium governance isn't about making the fastest decision. It's about making the best decision with the information available at the time. And sometimes the most valuable information is the information that hasn't been discovered yet.

Have a question about this topic?